AUl3 View our Sustainability statement and projects | HPW

HPW designed this York stone barn retro-fit as a low energy and low carbon scheme to reduce domestic energy consumption and reliance on oil. Located 600 ft up in a moorland location near Harrogate, there is no mains gas supply, so an extensive GSHP system was designed to provide all pre-heating for the newly installed under-floor heating and high performance domestic hot water system.

The building shell was super-insulated internally using Triso Super 10 insulation and high levels of air tightness was achieved with new windows and doors. The owners remained in the property throughout the refurbishment and POE study of the property is ongoing.

Call us on +44(0)23 8081 1808

AECB
CLA