As part of the ongoing improvements of the Park, a new engineering and repair workshop has been designed by HPW.

With all of the on-site rides being maintained by the Paultons team, it was an essential requirement for high levels of natural light and ventilation as well as good insulation for winter working to be incorporated.

 
AECB
CLA